Why do we put stones on railway tracks 2024?
I'll answer
Earn 20 gold coins for an accepted answer.20
Earn 20 gold coins for an accepted answer.
40more
40more

Julian Davis
Works at the International Telecommunication Union, Lives in Geneva, Switzerland.
As a civil engineering expert with a focus on railway infrastructure, I'd like to delve into the multifaceted role that crushed stones, or ballast, play in the construction and maintenance of railway tracks. The use of ballast is a critical component of track design, serving a variety of functions that are essential for the safe and efficient operation of trains.
Firstly, the primary function of ballast is to provide a stable and resilient foundation for the track. The stones, which are typically crushed to a uniform size, distribute the weight of the trains evenly across the ground, preventing the rails from sinking into the soil. This is particularly important in areas with soft or unstable ground, where the weight of the trains could otherwise cause significant damage.
Secondly, ballast plays a crucial role in drainage. The interlocking stones create a network of gaps that allow water to flow through the track bed, preventing the buildup of water that could lead to flooding or erosion. This is especially important in regions with high rainfall or where the track is built in low-lying areas prone to flooding.
Thirdly, the stones in the ballast help to maintain the alignment of the rails. Over time, the vibrations and forces exerted by passing trains can cause the rails to shift out of place. The ballast, with its angular and interlocking shape, resists such movements and helps to keep the rails in their correct position.
Additionally, ballast provides a degree of flexibility to the track. The stones can shift slightly under the weight of passing trains, which helps to absorb some of the impact and reduce wear on the rails and sleepers. This is particularly beneficial for high-speed railways, where the forces involved are much greater.
Another aspect to consider is the cost-effectiveness of ballast. Crushed stones are relatively inexpensive and widely available, making them an economical choice for track construction. Moreover, the use of ballast simplifies the construction process, as it does not require the same level of precision in laying the track as other methods might.
Lastly, the ballast also serves as a form of insulation, preventing the transfer of heat from the hot rails to the ground, which can be significant in extreme weather conditions.
In summary, the use of ballast on railway tracks is a comprehensive solution that addresses stability, drainage, alignment, flexibility, cost, and thermal insulation. It is a testament to the ingenuity of railway engineering and the importance of considering multiple factors in the design of such a critical infrastructure.
Firstly, the primary function of ballast is to provide a stable and resilient foundation for the track. The stones, which are typically crushed to a uniform size, distribute the weight of the trains evenly across the ground, preventing the rails from sinking into the soil. This is particularly important in areas with soft or unstable ground, where the weight of the trains could otherwise cause significant damage.
Secondly, ballast plays a crucial role in drainage. The interlocking stones create a network of gaps that allow water to flow through the track bed, preventing the buildup of water that could lead to flooding or erosion. This is especially important in regions with high rainfall or where the track is built in low-lying areas prone to flooding.
Thirdly, the stones in the ballast help to maintain the alignment of the rails. Over time, the vibrations and forces exerted by passing trains can cause the rails to shift out of place. The ballast, with its angular and interlocking shape, resists such movements and helps to keep the rails in their correct position.
Additionally, ballast provides a degree of flexibility to the track. The stones can shift slightly under the weight of passing trains, which helps to absorb some of the impact and reduce wear on the rails and sleepers. This is particularly beneficial for high-speed railways, where the forces involved are much greater.
Another aspect to consider is the cost-effectiveness of ballast. Crushed stones are relatively inexpensive and widely available, making them an economical choice for track construction. Moreover, the use of ballast simplifies the construction process, as it does not require the same level of precision in laying the track as other methods might.
Lastly, the ballast also serves as a form of insulation, preventing the transfer of heat from the hot rails to the ground, which can be significant in extreme weather conditions.
In summary, the use of ballast on railway tracks is a comprehensive solution that addresses stability, drainage, alignment, flexibility, cost, and thermal insulation. It is a testament to the ingenuity of railway engineering and the importance of considering multiple factors in the design of such a critical infrastructure.
2024-06-11 12:55:11
reply(1)
Helpful(1122)
Helpful
Helpful(2)
Studied at the University of Melbourne, Lives in Melbourne, Australia.
The crushed stones are what is known as ballast. Their purpose is to hold the wooden cross ties in place, which in turn hold the rails in place. ... The answer is to start with the bare ground, and then build up a foundation to raise the track high enough so it won't get flooded.Dec 6, 2014
2023-06-07 16:39:30

Ethan Gonzales
QuesHub.com delivers expert answers and knowledge to you.
The crushed stones are what is known as ballast. Their purpose is to hold the wooden cross ties in place, which in turn hold the rails in place. ... The answer is to start with the bare ground, and then build up a foundation to raise the track high enough so it won't get flooded.Dec 6, 2014